Units housing windturbine inverters (56)

Units housing windturbine inverters (56)

Units housing windturbine inverters (56) Client: SIEMENS for the EDF (The French Electricity Board) For Siemens, Modulo Béton built (245 m2) a wind farm able to house inverters and transformers each weighing 70 tonnes. Retention containers (50 m2 trenches dug...
Household waste recycling center Saint Pons de Thomières (34)

Household waste recycling center Saint Pons de Thomières (34)

Household waste recycling center Saint Pons de Thomières (34) Site name: Saint Pons de ThomièresProject owner : TRIFYL (a renewable energy division) (81) Replacing an outdated modular metal waste management facility presenting safety hazards. The existing bay was...
Household waste recycling center, Brive-la-Gaillarde (19)

Household waste recycling center, Brive-la-Gaillarde (19)

Household waste recycling center, Brive-la-Gaillarde (19) Site name: BRIVE « Léo Lagrange »Project owner: The Brive area (19) SIRTOM (Intercommunal Association for the Collection and Management of Household waste) The work carried out for the Brive area SIRTOM on an...
Shutdown units for electrical transformers (2A)

Shutdown units for electrical transformers (2A)

Shutdown units for electrical transformers (2A) Client: SIEMENS for the EDF (The French Electricity Board) Siemens chose Modulo Béton to build units to house electrical switchgear closets for 6 villages around Ajaccio.Siemens chose the Modulo Béton modular solution...
Household waste recycling center Pardies (64)

Household waste recycling center Pardies (64)

Household waste recycling center Pardies (64) Site name : Pardies?Project owner : CCLO Communauté de Communes (Community of Local Councils) Lacq Orthez The CCLO (Community of Local Councils) owns land to set up a HWRC, however part of it is in a (FRMP flood risk...